Case Study Provided by DRS – Dome & Roofing Solutions.

 

Scope: This dome was in terrible condition! Mold had penetrated the structure. The foam was rotted and the outer layer was deteriorated. Trees were growing on top of the dome! The owner tried three different “solutions”, all of which quickly failed – stucco, paint, & an elastomeric rubberized membrane. We removed all of the exterior fabric that remained, as well as many rotted areas. We re-foamed the complete dome, which provided a stable surface that we could work upon. We then sealed the dome in a UV resistance, waterproof, seamless rubber membrane that has a life expectancy of 20 years.